As a Release Manager, it is possible to define the Definition of Done (DoD) for the Analyst and the Quality Assurance / Testers for a particular build.
By using the applicable ‘Manage Analyst DoD’ the Release Manager can define any number of specific criteria that the Analyst will be required to confirm as having been ‘done’ for that particular build. A different DoD list can be defined for the QA team.
The sample below shows the DoD for the Analyst.
The Analyst / Tester is prompted to ‘tick’ each DoD task prior to progressing the workflow to the next stage. These DoD results form part of the ‘Build History’ and Audit trail for every GLU.Engine ever built. This serves to establish sound discipline within the team using the GLU.Console.
